SupAirVision Operations Team

Ressources

Volta goes monster-hunting at Loch Ness !

Published on 15/09/2025

Together with our partners Innovair, our Volta technician Élie Amour and pilot Alexandre Zirn completed the missions using both the classic and gap-nacelle protocols. 

 

Did you know? 

In Scotland, a single turbine can be struck by lightning 1–2 times a year. That’s why regular inspections of the Lightning Protection System (LPS) are critical. 

 

With Volta, inspections mean: 

  • A drone and a ground station system equipped with an ohmmeter for accurate resistance measurements 
  • Safety, speed, and reliability at the core of every mission 
  • Express reports (resistance values only) within 48h, or detailed reports (resistance + FPV photos of receptors) delivered within 2 weeks 
  • Three inspection protocols designed to adapt to every turbine type 

 

In just 30 to 60 minutes, Volta can complete a full LPS inspection, saving downtime, reducing costs, and preventing serious lightning-related damage. 

 

Wherever your turbines are, SupAirVision is ready to go. Volta’s compact hardware makes international deployments easy and efficient. 

 

 Fast. Reliable. Global. 

That’s Volta. 

 

Want to know more about LPS inspections? Let’s talk. 

 

 

news.latest
Worldmap
Published on 23/12/2025

8,250 km apart but one shared mission

A few days ago, our teams were operating in two different locations, one in Lithuania and the other in Guadeloupe, yet they shared the same mission : ensuring the performance of wind farms.
Snow-covered wind farm
Published on 15/12/2025

Winter is coming ...

Winter is a harsh season for wind turbines. Are you truly prepared for it ?
South Africa's outlines.
Published on 02/12/2025

SupAirVision expands into South Africa !

Last week, SupAirVision unlocked a new country in it's World Map.